Project Description:
Yearout Mechanical, Inc. acted as the design-build mechanical contractor on this church project. It is unique in that the worship center has a raised access floor and the raised floor is used as a plenum for supply air. This unique mechanical design produced a very quiet system with very good temperature control and air quality in addition to being very efficient and economical. In addition to the supply air being distributed below the floor it is also distributed from below the “stage”.